pile foundation construction procedure
Hello Everyone. In this Article I'm going to share with you the steps for casting a Pile Foundation Through Pictures.
![]() |
| Manual Pile Boring System |
At first Boring is done at site. Boring can be done manually or using machines like Auger Boring Machine. This is a manual boring system. In this system boring is done by using Tripod & hammer. Hammers are of different weight. In this image the hammer is of 3.5 tons.
While boring is going, cleaning is also very important so that we can bore deeper. In this picture cleaning process is going by using cleaning bucket.
![]() |
| Cleaning Pile on Progress. |
![]() |
| Pile Cleaning Bucket. This is a one way bucket. Mud & rocks can enter here but cant exit. You can see the opening of cleaning bucket here. |
|
| Pile After Cleaning. |
To Read more read our 2nd Part Here -
Subscribe to:
Post Comments
(
Atom
)
-
PHYSICS here our team provide physics capsule as per syllabus of rrb je . Scalar Quantities Physical quantities which have magnit...
-
Content Hydrology Hydrological cycle, Ground water hydrology, Well hydrology and related ,data analysis; Streams and their gauging...
-
When a real fluid flows over a solid body ,the fluid particles at the surface of the body flow with the same velocity as that of the surfa...
Civil Engineering Interview Questions
Civil Engineering Interview Questions Q1 . What is civil engineering ? Q2 What is work of a civil engineer ? Q3 Define various...





No comments :
Post a Comment